Construction of Drainage Reserviors, Pump Rooms and Combined Utilities Building at Al Khor Expressway (16-031) Package 3B

PROJECT DETAILS

  • CLIENT :
  • DESIGN CONSULTANT :
  • SUPERVISION CONSULTANT :
  • MAIN CONTRACTOR :
  • STATUS :
  • ASHGHAL
  • Parsons
  • KEO
  • Tekfen Construction
  • ONGOING

PROJECT DESCRIPTION

"Al Khor Expressway Project (AKE)" to construct an "Expressway" standard road to the north of Doha including witheight grade separated junctions. The proposed upgrade genrally follows the alignment of the existing Al Khor Coastal Road between Lusail and the proposed Al Khor Bypass. The approximate southern extend for Phase 1 is the Doha Golf Club and the northers extent is up to the proposed Simaismah Junction, and the approximate sounthern extent of Phase 2 is the Simaismah Junction and the northern extent is the proposed Al Khor Bypass up to and including the Al Khor Stadium Signal.

SCOPE OF WORK

1. Structural, Electrical and Mechanical Works (incl. Instrumentation Works as Provisional Item) of Drainage Reservoir and Pump Room at Interchange F of Package 3B including discharge lines abd all supply and installations.

2. Structural, Electrical and Mechanical Works (incl. Instrumentation Works as Provisional Item) of Drainage Reservoir and Pump Room at Interchange F1 of Package 3B including discharge lines abd all supply and installations.

3. Structural, Architectural, Electrical, Mechanical -as Provisional Item- SCADA Works of Combined Utilities Building between Interchanges F and F1 of Package 3B including all supply and installations.

SPECIFIC SCOPE OF WORKS

1. Supply and Installation of SCADA System.

2.Infrastructure fiber optic cabling for Cameras, Traffic Signals in the Al Khor Expressway Package 3B.

3. Supply and Installation of Traffic Signals and Interfacing with SCADA System.

RELATED PROJECTS

Al Salata Al Jadeeda/ Al Muntazah,Street # 330,Villa # 128,
P.O. Box 23761, Doha – Qatar.